
Project Overview
This prime location offers a peaceful escape within the bustling city, combining modern convenience with serene surroundings. Discover a place where sophistication meets urban charm, inviting you to savor the best of both worlds in this hidden gem of Los Angeles, California.
Scope of Work
- High performance exterior glass replacement: Executed a meticulous replacement of exterior glass with high-performance materials. Enhanced energy efficiency, durability, and aesthetic appeal through the installation of top-tier glass.
- Recaulking with articulating electric boom lift: Employed an articulating electric boom lift for safe and efficient access to high elevations. Conducted thorough re-caulking to reinforce the building envelope and protect against water intrusion.
Results
The service work done at 1990 S Bundy Drive showcases our commitment to quality, safety, and building longevity, ensuring structural integrity and visual excellence.
Services Provided
- High-performance exterior glass replacement
- Re-caulking with articulating electric boom lift
- Building envelope maintenance
Project Details
- Location
- Los Angeles, CA
- Service Type
- Maintenance & Repairs
- Sub-Services
- Glass Replacement & Repair
- Client
- Douglas Emmett
Project Photos
Related Projects

US Bank Santa Monica Glass Replacement

Target LA Sunset Store

1031 S Broadway - Skylight Replacement
From Our Blog

Replacing Oversized / Hard-to-Source Commercial Glass
How to replace oversized and hard-to-source commercial glass, jumbo IGUs, discontinued Low-E coatings, field measurement, rigging, and realistic lead times.
November 12, 2026
Emergency Commercial Board-Up and Glass Replacement
How emergency commercial board-up and glass replacement works, securing the opening fast, then matching IGU, tempered, and Title 24 specs on the permanent…
October 29, 2026
Commercial Glazing Maintenance Checklist for Property Managers
A seasonal maintenance checklist for commercial glazing systems. Learn how to inspect seals, identify early failure signs, extend system lifespan, and avoid costly emergency repairs.
April 16, 2026