
Project Overview
Media Studios is a 19-acre, landscaped entertainment and media campus in the heart of Burbank, California. Ramos Industries Inc. was engaged to reset glass and re-caulk exterior joints across the campus to prevent water infiltration and maintain the structural integrity of the existing glazing. The work demanded meticulous attention to glass alignment and jobsite safety, re-establishing water-tight seal protection throughout the property.
Scope of Work
Ramos Industries reset and realigned glass across the 19-acre campus to correct movement and restore proper engagement in the frames, then re-caulked the exterior joints to re-establish a water-tight seal. Both operations demanded careful attention to alignment and jobsite safety, with the goal of stopping water infiltration and protecting the structural integrity of the building envelope.
Services Provided
- Glass resetting and realignment
- Exterior caulking for water infiltration prevention
Project Details
- Location
- Burbank, CA
- Service Type
- Maintenance & Repairs
- Client
- Worthe Real Estate Group
Project Photos
Related Projects

Target LA Sunset Store

1031 S Broadway - Skylight Replacement

US Bank Santa Monica Glass Replacement
From Our Blog

Replacing Oversized / Hard-to-Source Commercial Glass
How to replace oversized and hard-to-source commercial glass, jumbo IGUs, discontinued Low-E coatings, field measurement, rigging, and realistic lead times.
November 12, 2026
Emergency Commercial Board-Up and Glass Replacement
How emergency commercial board-up and glass replacement works, securing the opening fast, then matching IGU, tempered, and Title 24 specs on the permanent…
October 29, 2026
Curtain Wall Recaulk and Reseal: When and Why
When to recaulk and reseal a commercial curtain wall, how to tell weathering from system failure, and the AAMA 501.2 water test that proves the fix worked.
October 22, 2026