Commercial Glazing Services in Rancho Palos Verdes, CA
Expert commercial glass, aluminum framing, and glazing services
When Rancho Palos Verdes general contractors and property owners need commercial glazing done on schedule and to code, Ramos Industries shows up. We're a California licensed (CA C-17 #1034872) glazing subcontractor with 35+ years on the tools, working to South Bay city permitting and California Title 24 and matching glass and framing to mild coastal Southern California weather with ocean breezes.
Commercial Services in Rancho Palos Verdes
Glass Replacement
Professional glass replacement for commercial properties in Rancho Palos Verdes.
Industries We Serve in Rancho Palos Verdes
Why Choose Ramos Industries
California & Arizona Service
Licensed glazing contractor serving commercial clients throughout California and Arizona. We maintain deep familiarity with Los Angeles County building codes and work closely with local inspectors.
- 35+ years in business
- Licensed & insured
- CA & AZ coverage
Frequently Asked Questions: Rancho Palos Verdes
Recent Commercial Work in Rancho Palos Verdes
A sample of completed glazing projects we've delivered in Rancho Palos Verdes and the surrounding Los Angeles area.

US Bank Santa Monica Glass Replacement
Ramos Industries replaced a broken exterior sidelite at a US Bank branch in Santa Monica. The team removed damaged glass and installed new clear tempered glazing while maintaining customer access during business hours. The primary challenge involved precise alignment with the existing floating header and U-channel system.

La Plaza NanaWall Door Installation
Fabrication and installation of two exterior NanaWall systems and one interior Haworth Trivati glass partition. The exterior NanaWall units create large operable openings that allow the space to transition from enclosed to open air, modernizing ground-level spaces with dual-glazed exterior units and single clear interior glass.

Media Studios
Glass resetting and exterior caulking at a 19-acre entertainment/media campus to prevent water infiltration and maintain structural integrity. The work required meticulous attention to alignment and safety, establishing water-tight seal protection.
Related Articles

How to Spec Aluminum Storefront for a Commercial Project (GC Checklist)
A GC's checklist for specifying aluminum storefront: framing depth, thermal break, Title 24 SHGC/U-factor, AAMA/ASTM test ratings, glass, and finish.

Thermal-Break vs. Non-Thermal Aluminum Framing (and What It Costs You in Title 24)
Thermal-break vs. non-thermal aluminum framing: how the break lowers U-factor, why Title 24 usually requires it, and what skipping it costs your project.

Unitized vs. Stick-Built Curtain Wall: Cost, Lead Time & When to Use Each
Unitized vs. stick-built curtain wall compared on cost, lead time, install speed, and water testing — so GCs pick the right facade method for the project.
We use cookies and similar technologies to improve your experience on our website.