
Project Overview
Ramos Industries partnered directly with celebrity Dr. Ryan Osborne for the Osborne Head & Neck Institute project. This engagement involved comprehensive exterior and some interior glazing work, enhancing the facility with modern glass and framing systems. The project focused on delivering a professional and functional aesthetic for the institute.
Scope of Work
Ramos Industries supplied and installed an Arcadia 2” X 4-1/2” offset glazed system, featuring GW 1” insulated tempered glass with low E for energy efficiency. The scope included storefront framing, storefront doors, and Arcadia multi sliders. Additionally, the team installed both FHC cable railing and FHC aluminum railing systems, along with aluminum panels.
Site Conditions & Challenges
The project primarily involved exterior work, with storefronts installed on both the west and east elevations of the building. Despite the extensive scope, the project proceeded without any major challenges, demonstrating efficient execution.
Results
The successful completion of the Osborne Head & Neck Institute project provided Dr. Ryan Osborne with a modern, professionally glazed facility. The installed systems contribute to the institute's aesthetic and functional requirements, showcasing Ramos Industries' expertise in commercial glazing.
Services Provided
- Tenant Improvement
- Storefronts
- Glass Railings & Guardrails
- Glass Walls, Doors & Partitions
- Energy Efficient Glass
- Aluminum Panels
- New Construction
- Engineering & Design
- Project Field Management
- Pre Construction Planning
- Security Solutions
- CAD Services
- Sound Reduction Windows
Project Details
Project Photos
Related Projects

First Financial Credit Union & Corporate Center

19326 Ventura Blvd

Wilshire Courtyard Suite 550 for APM Music
From Our Blog

Glazing Scope Gaps That Blow Up Commercial Schedules
The glazing scope gaps that quietly wreck commercial schedules, perimeter sealant, blocking, embeds, lead times, and how GCs close them before bid award.
October 15, 2026
Value-Engineering Glass Without Failing Title 24
Cut glazing cost without failing Title 24: where to value-engineer glass and framing safely, and which SHGC/U-factor moves quietly break compliance.
October 8, 2026
How to Prequalify a Glazing Subcontractor
A GC's checklist to prequalify a commercial glazing sub: license, insurance, W-2 crews, system experience, AAMA/ASTM test track record, and warranty.
October 1, 2026