Looking for Residential Services?

Project Overview
Nestled in a premier location, this space embodies a perfect blend of modernity and tranquility, offering a refined setting for business and leisure alike.
Scope of Work
- Complete exterior glass building envelope: Executed a comprehensive installation of the entire exterior glass building envelope. Ensured a cohesive and modern aesthetic while prioritizing energy efficiency and structural integrity.
- Storefront frames: Crafted and installed storefront frames with a clear anodized finish for durability and visual appeal. Utilized blue reflective insulated glass for both functionality and a striking aesthetic impact.
- Butt jointed vertical edges: Employed precision techniques to butt-joint the vertical edges of the insulated glass. Achieved a sleek and seamless appearance, enhancing the overall contemporary design.
- Storefront doors: Installed high-quality storefront doors, combining functionality and style. Ensured smooth operation and secure access points.
Results
Our commitment to excellence in design and performance created a modern and visually impressive exterior for the building.
Services Provided
- Complete exterior glass building envelope installation
- Storefront frame installation
- Butt-jointed insulated glass installation
- Storefront door installation
Project Details
- Location
- Rancho Palos Verdes, CA
- Service Type
- New Construction
- Client
- Advanced Contractors
- Materials & Hardware
- Doors: High-quality storefront doorsFraming: Clear anodized finish framesGlass: Blue reflective insulated glass
Gallery
Project Photos
Our Work


Related Projects

Tenant Improvement
StorefrontStorefrontsGlass Railings & GuardrailsGlass Walls, Doors & PartitionsEnergy Efficient GlassSound Reduction Windows
Osborne Head & Neck Institute
Santa Monica, CA

New Construction
CAD ServicesPre Construction PlanningEngineering & DesignProject Field Management
First Financial Credit Union & Corporate Center
Pasadena, CA

Tenant Improvement
Storefronts
Fire-Rated Glass Installation
Southern California
Insights


From Our Blog

Curtain Wall Recaulk and Reseal: When and Why
When to recaulk and reseal a commercial curtain wall, how to tell weathering from system failure, and the AAMA 501.2 water test that proves the fix worked.
October 22, 2026
Glazing Scope Gaps That Blow Up Commercial Schedules
The glazing scope gaps that quietly wreck commercial schedules, perimeter sealant, blocking, embeds, lead times, and how GCs close them before bid award.
October 15, 2026
Value-Engineering Glass Without Failing Title 24
Cut glazing cost without failing Title 24: where to value-engineer glass and framing safely, and which SHGC/U-factor moves quietly break compliance.
October 8, 2026