
Project Overview
Ramos Industries was brought in to remove and replace a massive floor-to-ceiling glass panel in the heart of the Omni Hotel's main atrium.
Scope of Work
The existing panel had suffered damage and required expert coordination to replace without disrupting the surrounding finishes, fixtures, or hotel operations. From initial site protection to the final set, the work took place around high-end surfaces and seasonal installations. Timing, equipment handling, and field safety were key.
Results
This project is a great example of what we specialize in. Precision glazing work in premium environments, delivered with minimal impact to daily operations. The replacement was completed successfully, restoring the clean, seamless appearance the space is known for.
Services Provided
- Oversized floor-to-ceiling glass panel replacement
- Spider crane operation for interior precision glazing
- Atrium glass system restoration
Project Details
- Location
- Los Angeles, CA
- Service Type
- Maintenance & Repairs
- Client
- Omni Hotels & Resorts
Project Photos
Related Projects

Target LA Sunset Store

1031 S Broadway - Skylight Replacement

US Bank Santa Monica Glass Replacement
From Our Blog

Emergency Commercial Board-Up and Glass Replacement
How emergency commercial board-up and glass replacement works, securing the opening fast, then matching IGU, tempered, and Title 24 specs on the permanent…
October 29, 2026
Curtain Wall Recaulk and Reseal: When and Why
When to recaulk and reseal a commercial curtain wall, how to tell weathering from system failure, and the AAMA 501.2 water test that proves the fix worked.
October 22, 2026
AAMA / ASTM Testing for Curtain Wall: What GCs Should Demand
The AAMA and ASTM tests GCs should demand on curtain wall: E283 air, E331/AAMA 501.1 water, E330 structural, 501.4 seismic, 502 field testing. Full guide.
August 6, 2026