
Project Overview
Nestled in The Grove in Los Angeles. Their store is a curated haven for adventure enthusiasts, offering top-notch gear and apparel for every nature lover.
Scope of Work
- entrance: Installed curtain wall framing with Jumbo-Sized Glass at the entrance. Enhanced aesthetics and visibility with a grand entrance featuring expansive glass panels.
- Side storefront windows: Fitted side storefront windows and frames with clear tempered glass. Provided durability and clarity, allowing natural light to showcase Backcountry's products.
- Interior storefront: Implemented storefront frames with quarter-inch clear glass inside the store. Created a seamless and transparent interior environment, promoting a spacious and inviting atmosphere.
- Doors with panic hardware: Integrated storefront doors with panic hardware for enhanced safety. Ensured smooth egress and ingress, combining functionality with a sleek design.
Results
This comprehensive project not only revitalized the exterior aesthetics but also prioritized transparency, durability, and safety for an optimal shopping experience at Backcountry's Retail Store.
Services Provided
- Curtain wall framing with jumbo glass installation
- Storefront window and frame installation
- Interior storefront framing
- Storefront door installation with panic hardware
Project Photos
Related Projects

Osborne Head & Neck Institute

First Financial Credit Union & Corporate Center

Four Elements Custom Container Office
From Our Blog

Commercial Facade and Glazing Trends for 2026
The 2026 commercial facade trends GCs and architects need: unitized curtain wall, thermal-break upgrades, Title 24 performance, and dynamic glass.
November 19, 2026
Curtain Wall Recaulk and Reseal: When and Why
When to recaulk and reseal a commercial curtain wall, how to tell weathering from system failure, and the AAMA 501.2 water test that proves the fix worked.
October 22, 2026
Glazing Scope Gaps That Blow Up Commercial Schedules
The glazing scope gaps that quietly wreck commercial schedules, perimeter sealant, blocking, embeds, lead times, and how GCs close them before bid award.
October 15, 2026