Looking for Residential Services?

Project Overview
Ramos Industries partnered with Four Elements Contractors to complete glazing for a uniquely designed office built from converted shipping containers.
Scope of Work
- Exterior scope: We installed a bronze aluminum storefront system using 1 3/4" x 4" framing and 3/8" clear tempered glass. A set of standard double entry doors was included, delivering durable access while maintaining a clean, modern look that complements the container's streamlined design.
- Interior scope: Inside, our team installed partition walls using top and bottom U-channel to secure 1/2" clear tempered glass. The interior was finished with 1/2" Herculite-style frameless glass doors and bronze hardware.
Results
This project highlights Ramos Industries' ability to deliver customized glass systems for alternative building concepts.
Services Provided
- Bronze aluminum storefront system installation
- Interior glass partition installation
- Frameless glass door installation
- Custom container office glazing
Project Details
- Location
- California
- Service Type
- New Construction
- Client
- Four Elements Contractors
- Materials & Hardware
- Hardware: Bronze hardwareInterior glass: 1/2" clear tempered glass partitionsEntry doors: Standard double entry doorsExterior glass: 3/8" clear tempered glassInterior doors: 1/2" Herculite-style frameless glass doorsExterior framing: Bronze aluminum storefront framing (1 3/4" x 4")Interior framing: Top and bottom U-channel
Gallery
Project Photos
Our Work


Related Projects

Tenant Improvement
StorefrontStorefrontsGlass Railings & GuardrailsGlass Walls, Doors & PartitionsEnergy Efficient GlassSound Reduction Windows
Osborne Head & Neck Institute
Santa Monica, CA

New Construction
CAD ServicesPre Construction PlanningEngineering & DesignProject Field Management
First Financial Credit Union & Corporate Center
Pasadena, CA

New Construction
580 Silver Spur Road
Rancho Palos Verdes, CA
Insights


From Our Blog

Commercial Facade and Glazing Trends for 2026
The 2026 commercial facade trends GCs and architects need: unitized curtain wall, thermal-break upgrades, Title 24 performance, and dynamic glass.
November 19, 2026
Curtain Wall Recaulk and Reseal: When and Why
When to recaulk and reseal a commercial curtain wall, how to tell weathering from system failure, and the AAMA 501.2 water test that proves the fix worked.
October 22, 2026
Glazing Scope Gaps That Blow Up Commercial Schedules
The glazing scope gaps that quietly wreck commercial schedules, perimeter sealant, blocking, embeds, lead times, and how GCs close them before bid award.
October 15, 2026