Commercial Glazing Services in Temple City, CA
Expert commercial glass, aluminum framing, and glazing services
Commercial glazing in Temple City demands more than glass: it demands knowledge of Los Angeles County permitting and Title 24 energy requirements, the right products for year round sunshine and Santa Ana wind events, and crews that can execute on a construction schedule. Ramos Industries brings all three — 35+ years in the field, a California C-17 Glazing License (#1034872), and a portfolio spanning retail storefronts, office towers, hospitality, and tenant improvements.
Commercial Services in Temple City
Storefront Glass
Professional storefront glass for commercial properties in Temple City.
Curtain Wall Systems
Professional curtain wall systems for commercial properties in Temple City.
Aluminum Framing
Professional aluminum framing for commercial properties in Temple City.
Tenant Improvements
Professional tenant improvements for commercial properties in Temple City.
Commercial Window Systems
Professional commercial window systems for commercial properties in Temple City.
Entrance Systems & Glass Doors
Professional entrance systems & glass doors for commercial properties in Temple City.
Glass Replacement
Professional glass replacement for commercial properties in Temple City.
Industries We Serve in Temple City
Why Choose Ramos Industries
California & Arizona Service
Licensed glazing contractor serving commercial clients throughout California and Arizona. We maintain deep familiarity with Los Angeles County County building codes and work closely with local inspectors.
- 35+ years in business
- Licensed & insured
- CA & AZ coverage
Frequently Asked Questions: Temple City
Recent Commercial Work in Temple City
A sample of completed glazing projects we've delivered in Temple City and the surrounding Los Angeles County area.

La Plaza NanaWall Door Installation
Fabrication and installation of two exterior NanaWall systems and one interior Haworth Trivati glass partition. The exterior NanaWall units create large operable openings that allow the space to transition from enclosed to open air, modernizing ground-level spaces with dual-glazed exterior units and single clear interior glass.

MBT 350 Glazing Installation
Complete glazing package installation including 9 storefront openings and 10 FHC aluminum barn-style slider doors using Atlas aluminum storefront material with clear anodized finish and 3/8" clear tempered glass at Manhattan Beach Towers Suite 350.

Safe Glass Replacement Near Power Lines
Glass replacement near high-voltage power lines at 2901 Alameda St. The team coordinated with the Los Angeles Department of Water and Power (LADWP) to obtain necessary permits and special safety measures for working close to live electrical infrastructure.
Nearby Service Areas
Related Articles

How to Spec Aluminum Storefront for a Commercial Project (GC Checklist)
A GC's checklist for specifying aluminum storefront: framing depth, thermal break, Title 24 SHGC/U-factor, AAMA/ASTM test ratings, glass, and finish.

Thermal-Break vs. Non-Thermal Aluminum Framing (and What It Costs You in Title 24)
Thermal-break vs. non-thermal aluminum framing: how the break lowers U-factor, why Title 24 usually requires it, and what skipping it costs your project.

Unitized vs. Stick-Built Curtain Wall: Cost, Lead Time & When to Use Each
Unitized vs. stick-built curtain wall compared on cost, lead time, install speed, and water testing — so GCs pick the right facade method for the project.
We use cookies and similar technologies to improve your experience on our website.