Commercial Glazing Services in Highland Park, CA
Expert commercial glass, aluminum framing, and glazing services
Ramos Industries is a CA C-17 #1034872-licensed commercial glazing contractor serving the Highland Park neighborhood of Los Angeles County since 1987. General contractors, property managers, and ownership groups rely on us for storefront installations, curtainwall work, glass replacement, fire rated assemblies, and after-hours emergency board up — all built to perform in year round sunshine and Santa Ana wind events.
Commercial Services in Highland Park
Storefront Glass
Professional storefront glass for commercial properties in Highland Park.
Curtain Wall Systems
Professional curtain wall systems for commercial properties in Highland Park.
Aluminum Framing
Professional aluminum framing for commercial properties in Highland Park.
Tenant Improvements
Professional tenant improvements for commercial properties in Highland Park.
Commercial Window Systems
Professional commercial window systems for commercial properties in Highland Park.
Entrance Systems & Glass Doors
Professional entrance systems & glass doors for commercial properties in Highland Park.
Glass Replacement
Professional glass replacement for commercial properties in Highland Park.
Industries We Serve in Highland Park
Why Choose Ramos Industries
California & Arizona Service
Licensed glazing contractor serving commercial clients throughout California and Arizona. We maintain deep familiarity with Los Angeles County County building codes and work closely with local inspectors.
- 35+ years in business
- Licensed & insured
- CA & AZ coverage
Frequently Asked Questions: Highland Park
Recent Commercial Work in Highland Park
A sample of completed glazing projects we've delivered in Highland Park and the surrounding Los Angeles County area.

La Plaza NanaWall Door Installation
Fabrication and installation of two exterior NanaWall systems and one interior Haworth Trivati glass partition. The exterior NanaWall units create large operable openings that allow the space to transition from enclosed to open air, modernizing ground-level spaces with dual-glazed exterior units and single clear interior glass.

MBT 350 Glazing Installation
Complete glazing package installation including 9 storefront openings and 10 FHC aluminum barn-style slider doors using Atlas aluminum storefront material with clear anodized finish and 3/8" clear tempered glass at Manhattan Beach Towers Suite 350.

Safe Glass Replacement Near Power Lines
Glass replacement near high-voltage power lines at 2901 Alameda St. The team coordinated with the Los Angeles Department of Water and Power (LADWP) to obtain necessary permits and special safety measures for working close to live electrical infrastructure.
Nearby Service Areas
Related Articles

How to Spec Aluminum Storefront for a Commercial Project (GC Checklist)
A GC's checklist for specifying aluminum storefront: framing depth, thermal break, Title 24 SHGC/U-factor, AAMA/ASTM test ratings, glass, and finish.

Thermal-Break vs. Non-Thermal Aluminum Framing (and What It Costs You in Title 24)
Thermal-break vs. non-thermal aluminum framing: how the break lowers U-factor, why Title 24 usually requires it, and what skipping it costs your project.

Unitized vs. Stick-Built Curtain Wall: Cost, Lead Time & When to Use Each
Unitized vs. stick-built curtain wall compared on cost, lead time, install speed, and water testing — so GCs pick the right facade method for the project.
We use cookies and similar technologies to improve your experience on our website.