Commercial Glazing Services in Downtown Los Angeles, CA
Expert commercial glass, aluminum framing, and glazing services
From ground level storefronts to high-rise curtainwall systems, Ramos Industries delivers commercial glazing for Downtown Los Angeles projects of every scale. We're licensed in California (CA C-17 #1034872), permit and submit to Los Angeles County permitting and Title 24 energy requirements, and specify glass and hardware suited to year round sunshine and Santa Ana wind events.
Commercial Services in Downtown Los Angeles
Storefront Glass
Professional storefront glass for commercial properties in Downtown Los Angeles.
Curtain Wall Systems
Professional curtain wall systems for commercial properties in Downtown Los Angeles.
Aluminum Framing
Professional aluminum framing for commercial properties in Downtown Los Angeles.
Tenant Improvements
Professional tenant improvements for commercial properties in Downtown Los Angeles.
Commercial Window Systems
Professional commercial window systems for commercial properties in Downtown Los Angeles.
Entrance Systems & Glass Doors
Professional entrance systems & glass doors for commercial properties in Downtown Los Angeles.
Glass Replacement
Professional glass replacement for commercial properties in Downtown Los Angeles.
Industries We Serve in Downtown Los Angeles
Why Choose Ramos Industries
California & Arizona Service
Licensed glazing contractor serving commercial clients throughout California and Arizona. We maintain deep familiarity with Los Angeles County County building codes and work closely with local inspectors.
- 35+ years in business
- Licensed & insured
- CA & AZ coverage
Frequently Asked Questions: Downtown Los Angeles
Recent Commercial Work in Downtown Los Angeles
A sample of completed glazing projects we've delivered in Downtown Los Angeles and the surrounding Los Angeles County area.

US Bank Santa Monica Glass Replacement
Ramos Industries replaced a broken exterior sidelite at a US Bank branch in Santa Monica. The team removed damaged glass and installed new clear tempered glazing while maintaining customer access during business hours. The primary challenge involved precise alignment with the existing floating header and U-channel system.

La Plaza NanaWall Door Installation
Ramos Industries was selected by Greystar and Pacificwest Construction to furnish and install new glass door systems at La Plaza.

Media Studios
Glass resetting and exterior caulking at a 19-acre entertainment/media campus to prevent water infiltration and maintain structural integrity. The work required meticulous attention to alignment and safety, establishing water-tight seal protection.
Nearby Service Areas
Related Articles

Seismic and Deflection Requirements for SoCal Curtain Wall
Seismic drift and deflection requirements for Southern California curtain wall, AAMA 501.4, L/175 limits, glass bite, and detailing for inter-story movement.

2025-2026 California Energy Code Changes Affecting Glazing
How the 2025-2026 California Title 24 energy code affects commercial glazing, U-factor, SHGC, VT, NFRC ratings, and what spec-writers should plan for.

Aluminum Storefront Systems Compared (Center-Set, Offset, Flush)
Center-set vs. offset vs. flush aluminum storefront, glazing plane, sightlines, water management, and where each system fits. Spec guidance for GCs.
We use cookies and similar technologies to improve your experience on our website.